Public Spaces Health in Design Landscape Architecture Material Reuse Airport Design Mass Timber Structures Wooden Buildings Temporary Structures Urban Planning Biophilic Design Building Projects Materials Building Design Urban Design Bosco Verticale Modern Facilities Contemporary Design WMK Architecture Traditional Thai Design Inclusive Design Residential Design Building Performance
Construction is now scheduled to start this month with completion targeted for late 2028.