Engineering ❯Electrical Engineering ❯Power Systems ❯Transformer Design
The National Energy System Operator’s final analysis identifies preventable technical and systemic failures at North Hyde Substation; regulators have launched an investigation into National Grid, with Heathrow starting recommended resilience upgrades.