Overview
- The blackout, reported on Thursday, November 26, 2026, left the port city of Sevastopol fully without power and hit dozens of settlements across the peninsula.
- Krymenergo and Sevastopolenergo said the outage stemmed from an "accident" at energy facilities outside Crimea and warned restrictions could last up to 12 hours as crews work.
- Local Telegram channels and Kremlin-installed authorities reported explosions and morning air-raid alerts that raised the possibility of strikes, but it remains unclear whether power infrastructure was directly hit.
- Public services were disrupted with trams in Yevpatoriia stopped and some Simferopol trolleybus routes replaced by buses, and utilities advised residents to unplug appliances until supply stabilizes.
- The outage continues a pattern of damage to links between Crimea and the Russian mainland since late October, a trend that has reduced spare capacity and increased the risk of longer interruptions to heating, water pumping and medical services.