Particle.news

Download on the App Store

Washington Bridge Closure Sparks Investigation and Traffic Chaos

After a sudden closure due to critical defects, the Washington Bridge incident has led to a federal investigation and severe traffic disruptions.

  • A structural engineer's alarm over potential catastrophic defects prompted the abrupt closure of the Washington Bridge's westbound span.
  • Despite the urgency, there is no evidence of high-level communication within the Rhode Island Department of Transportation (RIDOT) over the critical weekend before the closure.
  • The closure has caused significant traffic issues, with commute times drastically increasing and alternative routes becoming congested.
  • A federal investigation has been opened into allegations of false claims for payment on the Washington Bridge, with documents requested going back to January 2015.
  • RIDOT and external consultants are conducting a forensic analysis to determine the best course of action for the bridge, including the possibility of demolition.
Hero image