Particle.news

Vande Bharat Freight EMU Begins RDSO Trials, Hits 145 km/h on First Run

A month‑long RDSO validation in Kota will decide whether the 16‑coach prototype can speed time‑sensitive parcel and cold‑chain services on busy corridors.

Overview

  • The prototype entered formal technical trials on Wednesday, July 29, and reached a top recorded speed of 145 km/h during its first day of runs on the Kota–Nagda–Sawai Madhopur test corridor.
  • RDSO is running a structured roughly month‑long test programme that will include oscillation trials at staged speeds, emergency braking distance checks, coupler and curve performance tests, regenerative energy and signal‑interference assessments, and at least two round trips a day.
  • The 16‑coach EMU was built by ICF Chennai and carries two refrigerated DTC vans, two non‑driving trailers and 12 parcel coaches with Vande Bharat bogies, an axle load around 20.32 tonnes and a total payload near 397 tonnes.
  • The rake is fitted with KAVACH automatic train protection, forced ventilation, pneumatic retractable roller flooring, modern braking and propulsion systems, and doors that lock above 5 km/h to secure load integrity at speed.
  • Most outlets and official statements report the 145 km/h first‑day result, while one secondary report gave different speed figures; final performance numbers and any commercial rollout will depend on RDSO’s certification decisions and subsequent approvals.