Overview
- The Ayuntamiento of Valencia is formally studying regulatory adjustments to permit remonta, the addition of new floors, and increases in building heights to expand residential capacity.
- Any change must be written into the Plan General de Ordenación Urbanística (PGOU) and follow planning procedures plus technical, safety and habitability checks before work can proceed.
- Municipal groups PP and Vox have proposed that the Planning Service introduce these rule changes to boost housing supply, while the PSPV has re-filed an earlier motion demanding that homes created this way be designated VPP to guarantee affordability.
- The Generalitat’s Proyecto de Ley del Suelo, currently in parliamentary processing, offers a parallel route to speed housing by using vacant public plots through Proyectos Habitacionales Locales (PHL) to deliver protected homes.
- If adopted the measures could let owners and developers increase units in built neighbourhoods and ease supply pressure, but outcomes will hinge on how the PGOU defines buildability limits, technical feasibility rules, and whether created homes are required to be protected housing.