Overview
- A71 traffic is fully closed toward Sangerhausen between Arnstadt‑Nord and Erfurter Kreuz after a semi‑trailer overturned overnight, with recovery requiring off‑loading before the rig can be righted.
- On the A4 near Friedewald–Hönebach, a lorry breached the concrete median on wet pavement, seriously injuring the driver and forcing a full closure that pushed heavy vehicles onto the undersized L3069, causing significant blockages.
- The A44 toward the A7 at the Bergshäuser Bridge closes again from Thursday 30 October 20:00 to Friday 31 October 05:00 for additional deck‑plate work, and remaining repairs are now expected around 11 November subject to dry weather.
- Around Berlin’s Dreieck Funkturm, roughly 79 hours of diversions begin Thursday at 22:00 as Deges demolishes a closed bridge tied to the new Ringbahn crossing, with heavy vehicles rerouted off key links between the A100 and A115.
- The A3 at Emmerich will be fully closed in both directions from Friday 7 November 20:00 to Monday 10 November 05:00 for bridge demolition and rebuilds, with long‑distance traffic diverted via the A42 and A57.