Overview
- About 60 personnel from fire brigades, the DLRG and the district fire inspection responded to the staged collision between Starnberg and Gauting.
- The script simulated tree trunks on the track, an unconscious driver and roughly 30 injured passengers, including a wheelchair user.
- Crews isolated the railway power, deployed three‑metre Grabenbrücken to bridge the height gap and used rail rollwagen to move casualties.
- Drone teams provided live imaging to incident command and located a missing child who had left the scene in shock.
- The operation concluded in about 90 minutes north of the former Mühlthal station during a bridge‑works closure, with a written after‑action review to follow.