Overview
- Aerial photos published Sept. 20–21 by bioreconstruct and reported widely show a tower crane now on site for Piston Peak and extensive grading and excavations across the combined construction zone.
- Disney permanently closed and removed the Rivers of America, Tom Sawyer Island, and the Liberty Belle Riverboat in 2025 to clear the footprint for the new builds.
- Disney confirmed at D23 that Piston Peak National Park will house two Cars-themed attractions, Cars Ridge Run Rally and Miss Fritter’s Daredevil Spin-Along, and that Villains Land will include two major dark-ride attractions tied to Maleficent and the Magic Mirror plus dining and shops.
- The aerials also reveal wide infrastructure work: utility excavations in the Villains Land area, staged mature trees for later landscaping, a rising multi‑story backstage office building near Adventureland, and a rerouting of Floridian Way outside the park.
- The scale of the site work signals a lasting shift in Magic Kingdom toward large, IP-focused environments, a change that removes slower, atmosphere-driven experiences and will reshape guest circulation and backstage operations when the lands open; Disney has not announced opening dates.