Particle.news

Download on the App Store

Tijuana Sets Rehabilitation for Historic Post Office, Weighs Water Plant Expansion

Most initiatives are still in evaluation or preparation.

Overview

  • Authorities reported a plan to invest nearly 10 million pesos to rehabilitate the long-neglected Correos de México building in downtown Tijuana after roughly 15 years without remodeling.
  • CILA said it will evaluate a potential expansion of the San Antonio de los Buenos plant, with Manuel Morales noting the facility is currently operating at 800 liters per second.
  • A water-policy academic cautioned that desalinated supply would cost consumers more and urged conservation and efficiency as preferable measures for Baja California.
  • Cecut announced the XVII Semana de Teatro para niñas y niños “Ray Garduño,” scheduled for September 7–13 with a daily performance in the Sala de Espectáculos.
  • Arhitac reported that companies in Tijuana have begun drafting budgets to incorporate an expected salary increase for 2026.