Particle.news

Download on the App Store

Thameslink Train Stranded by Power Failure Sparks Major Service Disruption

After crews began controlled evacuations in the tunnel, engineers are battling to restore the power feed on the Thameslink line.

Image
Image
Thameslink is offering compensation to passengers for the disruption
Image

Overview

  • A power failure at around 8 pm between London St Pancras and West Hampstead halted all Thameslink services through central London.
  • Passengers on board the stranded train endured rising heat and lack of water or air conditioning, with some reporting illness.
  • Thameslink staff have begun controlled evacuations in the tunnel while engineers work to restore the electrical supply.
  • Affected travelers were advised to remain on board until directed and offered alternative routes via East Midlands Railway, LNER, Southern and London Underground services.
  • The wider network faces cancellations and delays of up to 60 minutes with commuters urged to check journeys and allow extra time.