Overview
- Officials said crews diverted creek flow and built a dirt access, which a fire engine crossed during testing on Dec. 28.
- The route remains closed to the general public as engineers complete safety inspections and plan permanent repairs.
- No injuries were reported from the washout, which carved away 20 to 30 feet of roadway at the Sycamore Drive bridge.
- Emergency teams hiked in supplies and aid while elderly and disabled residents faced the greatest access challenges.
- Residents reported heavy mud and debris with roughly 30 homes red-tagged and power shut off to those properties.