Particle.news

Tamil Nadu Seeks DPR for New OMR–ECR Link Road

The tender starts technical land studies to determine alignment, costs, the potential to cut long detours, ease OMR congestion.

Overview

  • The Highways Department has invited consultants to prepare a Detailed Project Report for a new link between Old Mahabalipuram Road and East Coast Road connecting Sholinganallur with Kovalam.
  • The DPR tender requires the appointed agency to finish the report within three months and to carry out land surveys, traffic counts, subsoil tests, groundwater assessment, and a land acquisition plan.
  • Officials say the link aims to shorten an existing roughly 12-kilometre detour used by commuters from Sholinganallur, Siruseri and Kelambakkam and to relieve heavy traffic on the OMR IT corridor.
  • The DPR will set the alignment, quantify land needs, produce cost estimates and identify environmental or groundwater constraints that will determine whether and how construction proceeds.
  • If approved and funded, the road could cut travel time on the route to an estimated duration reported by proponents and reduce congestion at Sholinganallur, though those benefits remain contingent on the DPR findings and subsequent approvals.