Particle.news

SNCF Unveils Oxygène Trains as Corail Replacement

CAF-built rakes promise wider space, stronger air conditioning, better accessibility, and a 50°C heat rating pending EPSF approval

Overview

  • The first public presentation of an Oxygène unit took place on Wednesday, Nov. 25, 2026, in Paris and SNCF says six rakes built by CAF are now on hand.
  • Oxygène cars are designed for comfort and climate resilience with variable lighting, enlarged luggage areas, ten dedicated bicycle places per train, improved first-class seats and air conditioning rated to withstand up to 50°C.
  • SNCF expects to file a safety dossier with the national regulator EPSF probably in February or very early March, with formal homologation possible in June followed by running tests and staff training that could delay commercial service into mid or late summer 2027.
  • SNCF Réseau has upgraded the two routes to receive the new trains, investing about €2.2 billion on the Paris‑Orléans‑Limoges‑Toulouse corridor and €890 million on the Paris‑Clermont line.
  • SNCF has scheduled local showings in Limoges on Dec. 4, 2026 and Clermont‑Ferrand on Jan. 27, 2027 so travelers can see the new stock while the formal approval and entry‑into‑service steps proceed.