Overview
- NHIDCL officials declared the bridge safe and reopened it July 16 after 55 days of renovation funded with Rs 2.75 crore.
- The Cachar district administration has imposed a 40-tonne weight cap effective July 19 for all vehicles crossing the structure.
- Checkpoints at Digarkhal (NH-06) and Dolu (NH-27) will operate round the clock under police, transport officers and magistrates to monitor compliance.
- A newly formed task force will conduct regular structural inspections and levy penalties on violators to prevent overloading.
- Prefabricated Bailey bridge construction over the Harang River will accelerate from July 20 to maintain regional connectivity during repairs.