Particle.news

Sheinbaum Sets 2027 Opening for Mexico City–Pachuca Rail Link

The extension will join the operating Buenavista–AIFA line to Pachuca to cut travel times and strengthen regional transport links.

Overview

  • President Claudia Sheinbaum announced the 2027 inauguration during her second-report assembly in Pachuca on Sunday, Sept. 13, 2026.
  • Construction is under way under plans that began with studies in October 2024 and a formal start in March 2025, with official progress near 37% as of June 2026.
  • Officials describe the route as roughly 65 kilometers of double electrified track with a 120 km/h top speed and trains sized for about 700 passengers, though some outlets report a 57-kilometer figure and differing cost estimates.
  • The work is being built by the Secretaría de la Defensa Nacional through the Agrupamiento de Ingenieros Felipe Ángeles and includes planned maintenance facilities in Zapotlán de Juárez and Mineral de la Reforma.
  • Students from Escuela Normal Rural Luis Villarreal El Mexe interrupted the announcement to demand dormitory repairs, full weekend food service, and restitution of school lands, underscoring local social grievances that could shape public reception.