Overview
- The chief minister ordered GHMC, HYDRAA and municipal departments to fast-track rejuvenation works along the Musi riverfront
- He directed that every tank and nala in the core urban area be linked into the river to channel excess rainwater away from flood-prone neighbourhoods
- Officials were instructed to widen drains and remove encroachments that have obstructed natural waterways during monsoon downpours
- The plan includes reviving water bodies and upgrading sewage and stormwater treatment to protect the Musi’s water quality
- The integrated infrastructure push aims to permanently alleviate seasonal waterlogging and reduce flood-induced traffic disruptions