Overview
- The Ulm–Augsburg long-distance rail line is fully closed from May 2 at 23:00 to May 5 at 05:00 for track and turnout upgrades, causing significant service disruptions.
- ICE, IC, and TGV trains are rerouted, skipping stops at Ulm, Neu-Ulm, and Günzburg, with travel times extended by up to 60 minutes.
- French TGV services between Paris and Munich are limited to the Paris–Stuttgart route during the closure, bypassing Ulm, Augsburg, and Munich altogether.
- From May 9 to 12, Munich's S-Bahn Stammstrecke will be shut down for infrastructure and signal system upgrades, affecting all lines except the S7.
- Replacement buses will operate every 10 minutes between Hauptbahnhof and Pasing during the Stammstrecke closure, with additional regional and U-Bahn options available.