Particle.news
Download on the App Store

Permits Signal Two-Year Overhaul of Universal’s Lost Continent With Intamin Named on Project

Filings indicate a major ride system, with no theme or attraction details disclosed.

Overview

  • A Florida DEP stormwater permit authorizes a 7.71-acre construction project from December 4, 2025 through December 4, 2027 within Islands of Adventure.
  • A new Notice of Commencement lists Intamin Ltd. and describes the work as “specialty equipment,” a term commonly used for attraction ride systems.
  • Demolition filings confirm the teardown of the former Poseidon’s Fury and Eighth Voyage of Sindbad buildings, with visible clearing now underway.
  • The Intamin-related notice lists an expiration date of February 28, 2026, pointing to an active manufacturing or installation phase into next year.
  • The permit activity lines up with earlier documents referenced as Project 555, and Universal has not named any intellectual property for the redevelopment.