Overview
- Deputy Mayor Inma Sanz said three men and one woman were reported missing by the contractor after upper floors fell inward, creating debris that could take days to clear.
- Emergency services reported three injured workers, including one hospitalized with a broken leg, with others treated for minor contusions at the scene.
- Firefighters said the failure occurred inside the five‑storey structure, leaving the facade standing, as drones and National Police dogs searched the rubble.
- Eleven or more fire crews, SAMUR teams and police sealed off Calle Hileras near Ópera, with at least one neighboring building evacuated as a precaution.
- The property, long vacant and being converted into a hotel by developer Rehbilita, drew visits from regional and city leaders as the mayor cut short a London trip.