Overview
- The new span provides a direct walkway between Terminal C, the Brightline rail station, and the Terminal Link on Level 4.
- Two sets of bidirectional moving walkways of about 90 feet each are operating with ramps for accessibility.
- GOAA says the walkways will be lengthened in 2026 when the Rental Car Lobby opens, with a third set planned later at the GTF Bridge.
- The bridge was part of Terminal C’s original design but was removed during COVID-19 cost reductions before being reinstated as travel rebounded.
- Airport leaders cite growth in international passengers in 2024 and note Terminal C’s Phase 1 expansion with four new boarding piers is underway.