Particle.news
Download on the App Store

NS Targets Full Timetable Friday After Cold Snap Triggers Major Train Repair Backlog

Access to maintenance halls was blocked by locked switches plus frozen points, leaving an unusually large volume of carriages awaiting work.

Overview

  • NS reports about 700 carriages required maintenance this week, roughly 300 more than normal.
  • Fewer trains ran on seven routes during the week due to limited available rolling stock.
  • Traffic control locked many track switches to prevent damage in subzero weather, which hindered routing to depots.
  • NS says trains are vulnerable to cold, with heaters malfunctioning and retractable boarding steps freezing.
  • After initially projecting a week to catch up, a spokesperson said services should return to the normal timetable by Friday.