Overview
- Full‑size maquettes of Claire Tabouret’s designs are on public view at the Grand Palais starting December 10 and running through March.
- The new windows will replace 19th‑century stained glass in six chapels along the cathedral’s south aisle.
- Production is underway at the Simon‑Marq master‑glazier workshop in Reims, a firm founded in 1640.
- Installation is scheduled for late 2026 with an estimated budget of €4 million.
- Tabouret was selected by the Ministry of Culture in December 2024, and the project has faced sustained opposition including a petition with about 300,000 signatures.