Overview
- The pool deck and street-level parking areas began failing at least seven minutes before the tower, according to investigators’ timeline.
- Visible distress in the weeks before the failure included cracks, a jammed gate, a sliding glass door off its frame, and worsening water leaks in the garage near the pool area.
- NIST reported critically low safety margins at the pool deck’s slab-column connections driven primarily by design understrength and misplaced slab reinforcement.
- Factors under examination include reinforcement corrosion, concrete shrinkage, construction deviations, and added loads from planters, palm trees and sand on the deck.
- Investigators aim to finish technical work by the end of 2025 with a detailed public update expected in spring or early summer 2026, as legal settlements and redevelopment at the site proceed.