Overview
- Rescue teams in Rasuwa district have recovered nine bodies and continue to search for 19 people swept away by the July 8 flash flood.
- The surge tore out the Miteri Bridge on the Pasang Lhamu Highway, carrying about 200 vehicles into the Bhotekoshi River.
- With the bridge gone, the main Nepal–China trade corridor has been severed, forcing rerouting of goods through India and raising transit costs.
- Floodwaters and debris damaged the Rasuwagadhi Hydropower Project and other local installations, interrupting regional electricity generation.
- Authorities are examining whether extreme monsoon rainfall or a glacial lake outburst in Tibet triggered the sudden deluge, underscoring rising Himalayan flood risks.