Overview
- Construction wrapped up at ₹1,368 crore over 2.5 years.
- Four-lane, access-controlled design bypasses NH-44, shortening the route by roughly 12 km.
- An interchange at Bandikui will link the spur directly to the Delhi-Mumbai Expressway, allowing seamless route changes.
- Operational by mid-July, the corridor is expected to cut Delhi-Jaipur travel to about 3–3¼ hours from around four hours today.
- NHAI plans to add a toll-saving feature to its Rajmargyatra app and study a greenfield expressway to connect Jaipur with the Delhi-Agra corridor.