Particle.news

Download on the App Store

New Analysis Finds Extra Load Reserves on Bad Schandau Elbe Bridge

Experts now weigh a higher weight limit alongside the choice between renovation or full replacement.

Overview

  • Saxony’s infrastructure minister said measurements show reserves beyond the current 7.5‑tonne cap.
  • Officials stated the bridge can remain in service for at least another year even if more prestressing‑steel breaks occur.
  • Investigations will determine whether the traffic limit can be raised based on the updated calculations.
  • The assessment will also decide between repair and a replacement build, which dictates whether a temporary bridge is needed.
  • The span reopened in April to vehicles up to 7.5 tonnes after tests, while heavy freight continues to use detours.