Particle.news

Download on the App Store

N-332 Reopens in Gandia After Truck Strikes 'Escalextric' Bridge

Crews secured the span to restore traffic, with full beam replacement expected in the coming weeks.

Overview

  • Both directions of the N-332 are open this morning, and the N-337 to the beach is limited to the inbound lane as the outbound lane remains closed.
  • The collision occurred around 1 a.m. when a waste-collection truck traveled under the viaduct with its crane boom deployed.
  • Officials reported damage to three beams and metal tensioners on the overcrossing, but the main structure does not require demolition.
  • Two people in a car and on a motorcycle sustained minor injuries during the incident.
  • Early reports citing demolition were later revised after the mayor’s briefing, and rapid highway work cleared debris and stabilized the site.