Overview
- Knight Frank’s Q3 2026 report, published Saturday, reported 80 planned data‑centre facilities across seven cities with Mumbai accounting for 34 projects, roughly 42.5% of the pipeline.
- The pipeline has moved toward bigger installations with 55% of planned facilities above 50 MW and the fastest growth in the above‑100 MW category, which rose sharply to 27 projects.
- Mumbai’s pipeline rose 9.7% from 31 projects in 2025 to 34 in Q3 2026 and the city now leads both mid‑size and very large segments with 16 projects in the 10–50 MW band and 15 above 100 MW.
- Hyderabad has become the second‑largest hub with 15 planned projects, doubling its above‑100 MW sites from four to eight and recording 14 of 15 projects, or 93.3%, above 50 MW.
- The shift to larger, concentrated facilities increases demand on local power, connectivity and land resources and could steer future investment and planning toward a smaller number of high‑capacity urban hubs.