Particle.news

Download on the App Store

Mumbai Metro 2B Prepares for First Trial Run on Key 5.4 km Stretch

The live-charged section between Diamond Garden and Mandale will undergo trial runs starting April 16, marking a step forward in improving east-west connectivity.

Overview

  • The 5.4 km stretch of Mumbai Metro 2B between Diamond Garden in Chembur and Mandale in Mankhurd has been live-charged and is ready for trial runs beginning April 16, 2025.
  • This section includes five stations—Diamond Garden, Shivaji Chowk, BSNL Metro, Mankhurd, and Mandale—enhancing connectivity in Mumbai's eastern suburbs.
  • The trial process will include integration testing, loaded trials, and inspections by the Commissioner of Metro Rail Safety before public operations can begin.
  • The line features six-coach, energy-efficient trains manufactured by Bharat Earth Movers Limited (BEML), equipped with modern amenities like mobile charging points and surveillance systems.
  • Once fully operational by December 2026, the 23.6 km Metro 2B will integrate with major transit networks, reducing travel time by up to 75%.

Loading Articles...

Loading Quotes...