Overview
- The 1.86-km, 34-metre-wide bridge on NH-31 links Aunta Ghat in Mokama to Simaria in Begusarai.
- Officials say the route can eliminate detours of up to about 100 km for heavy vehicles after restrictions on Rajendra Setu.
- Project specifications describe an extradosed cable-stayed design with segment spans of 57–115 metres and cantilever arms up to 70 metres.
- Reports cite a project cost of roughly ₹1,871 crore, with the foundation stone laid in October 2017.
- The ceremony drew Chief Minister Nitish Kumar and large crowds in rain, as ministers framed the bridge as a boost for trade, farming access, and the Barauni industrial belt.