Particle.news

Miraflores Prepares to Open Lima’s First Teleférico

A two-minute cable link designed to speed trips from the clifftop to Costa Verde awaits completion of an accessibility elevator and publication of a definitive fare plan.

Overview

  • Municipal officials say the teleférico is in marcha blanca with full mechanical and operational certification to European standards and could be inaugurated “in the next days,” though no official date has been set.
  • The line runs about 305 meters between Parque Domodósola and Playa Redondo in a vaivén design with two cabins that each hold 15 people and complete the trip in roughly two minutes.
  • The US$10 million project is operated by Consorcio Zigzag Teleféricos using Doppelmayr technology, and the operator will publish a tariff scheme before opening.
  • Safety measures include permanent rescue personnel trained and equipped with harnesses for cabin emergencies and systems certified under European rules, while final works still include installing an elevator for universal access.
  • Officials say fares will be split into three categories for Miraflores residents, national tourists and foreign tourists, and the service is expected to ease local trips, help beach and sports users carry bikes or surfboards, and boost visitor access to the Costa Verde and Larcomar.