Particle.news

Download on the App Store

Magdeburg Damaschkeplatz Bridge Closed Due to Severe Structural Damage

Critical cracks and wire breaks have rendered the bridge irreparable, prompting full closure and preparation for demolition.

  • A special inspection on April 14, 2025, uncovered critical cracks and wire breaks in tension members of the Damaschkeplatz bridge.
  • The bridge has been completely closed to all traffic, including cars, trams, cyclists, and pedestrians, with areas underneath also sealed off for safety.
  • Authorities have deemed the damage irreparable, and demolition preparations are now underway.
  • The closure has caused significant disruptions to public transport, with tram lines rerouted and delays anticipated.
  • Motorists and commuters are advised to use wide detours, with specific alternate routes provided to mitigate traffic congestion.
Hero image