Overview
- PennDOT says weekday construction runs from Dec. 1 to May 19 between 7 a.m. and 3:30 p.m., is weather dependent, and will cause delays.
- The interior lane around Logan Circle, the left inbound lane on the Benjamin Franklin Parkway, and the left lane on 19th Street north of the circle will be closed.
- Pedestrians will not be able to use the sidewalk around the circle or access the Swann Memorial Fountain during the work.
- Crews will rebuild the 15‑foot‑wide outer sidewalk and install eight ADA curb ramps to improve access and safety.
- The 101‑year‑old Swann Memorial Fountain remains partially inoperable after 2023 vandalism, with full restoration planned by May 2026.