Overview
- The planned interruption on October 29 affects San Isidro, Carabayllo, San Juan de Miraflores and Chorrillos.
- Carabayllo’s cut runs from 12:00 p.m. to 8:00 p.m. for reservoir cleaning, with specific associations and sectors listed by Sedapal.
- San Juan de Miraflores is scheduled from 8:00 a.m. to 8:00 p.m., and Chorrillos from 5:00 a.m. to 9:00 p.m., both for reservoir cleaning.
- San Isidro work involves a gate valve installation in Urbanización El Rosario starting at 12:00 p.m., with conflicting published restoration times that require verification with Sedapal.
- Sedapal advises storing water in clean, closed containers and says cistern trucks will supply water at strategic points to reduce the impact.