Particle.news

Download on the App Store

Kerala Breaks Ground on Anakkampoyil–Kalladi–Meppadi Twin-Tunnel Link

The state sets a 60-month delivery target for the ₹2,134.5 crore Kozhikode–Wayanad connection financed through KIIFB with KRCL as the project vehicle.

Overview

  • Chief Minister Pinarayi Vijayan launched construction at Anakkampoyil, formally starting work on Sunday.
  • The 8.73-km road will connect Thiruvambady and Meppadi through an 8.11-km twin tunnel between Marippuzha and Meenakshippalam.
  • Hyderabad-based Dilip Buildcon will construct the tunnels, and Royal Infrastructure will build the approach roads.
  • Officials say the corridor will offer an alternative to the Thamarassery Ghat route and could cut the AnakkampoyilMeppadi trip by about 22 km and 1.5 hours.
  • Planned systems include ventilation, firefighting units, tunnel radio, CCTV, escape-route lighting, emergency call points, traffic signals, and cross connections every 300 metres, and the finished asset is expected to rank as India’s longest twin-tunnel road and third-longest tunnel road.