Particle.news

Kasarvadavali Flyover Closed After Cracks and Hanging Concrete Found

MMRDA ordered the overbridge shut for repair work as investigators assess whether the visible damage needs reinforcement or only cosmetic fixes.

Overview

  • Local video and resident complaints that circulated last weekend showed a hanging concrete fragment and deep cracks on the flyover’s parapet, prompting an immediate safety check by MMRDA teams.
  • Traffic authorities issued Notification No. 202 and closed the overbridge to all vehicles from 11.59pm on Tuesday, Sept. 15, diverting traffic onto slip roads and alternate surface routes.
  • Emergency vehicles including ambulances, police and fire engines are exempted from the closure and will be allowed to use designated routes.
  • MMRDA inspectors are determining whether the visible fissures and joint-area damage are cosmetic or require structural repair or reinforcement, and no reopening date has been set.
  • The flyover is about 14 months old and its shutdown is straining Ghodbunder Road traffic while residents and activists press for contractor accountability and independent structural audits.