Particle.news
Download on the App Store

Jumeirah Beach 1 Upgrade 95% Complete, Reopening Set for Early February

The project advances Dubai’s Quality of Life 2033 goals with a 50% larger, tech-enabled, climate-ready shoreline.

Overview

  • Sheikh Hamdan reviewed the redevelopment on January 6, highlighting a people-centred approach to public beach design.
  • The upgraded stretch spans 1,400 metres and will feature modern recreational and family amenities with dedicated walking, cycling and jogging paths.
  • Smart systems include wireless internet, electronic information displays, smart lockers and AI-enabled rescue and monitoring linked to municipal control rooms.
  • Climate resilience measures raised the beach level and added 250,000 cubic metres of clean sand following technical and environmental studies.
  • Dubai Municipality outlined more than 15 investment opportunities and upgraded services with restrooms, showers, changing rooms and parking that includes EV charging.