Judge Authorizes Adif to Repair Urda High‑Speed Track Under Strict Documentation Rules

Permitting Adif to rebuild the damaged high‑speed section, the order demands detailed pre‑ and post‑repair records to preserve evidence for the sealed criminal probe.

Overview

  • A collision on the Madrid–Seville high‑speed corridor that killed 69 people led the investigating judge to authorize reconstruction of the damaged Urda track at Adif's request.
  • The authorization was issued by the titular judge of plaza nº2 at the Tribunal de Instancia de Orgaz in a notified judicial providencia that governs the inquiry.
  • The court imposed two specific documentation requirements: an initial inventory of all affected infrastructure after inspection and topographic surveys, and a full post‑repair list naming every element repaired, replaced or modified with exact locations.
  • Both the initial inventory and the post‑repair report must be sent to the judge and will be incorporated into the criminal file, which remains under secreto de sumario and restricts public disclosure.
  • The order clears the way for repair work to restore rail service but creates a tight evidentiary process that could extend work timelines and shape accountability and safety reviews for victims, operators and regulators.