Overview
- Genneia confirmed to regulators that César Pablo Rossi left the presidency and will remain a director titular until his term ends.
- Brito resumes the role he held from 2015 to 2022 while continuing as president of Banco Macro.
- The recent commissioning of the San Rafael solar plant lifted Genneia’s renewable capacity to more than 1,540 MW.
- The company operates eight wind parks and six solar parks, with the 130 MW San Juan Sur solar project under construction.
- Genneia reports cumulative investments above US$1.6 billion since 2016 and remains Argentina’s largest green‑bond issuer with more than US$1.28 billion placed.