Overview
- LVM3-M6 lifted off from Sriharikota at about 8:54–8:55 am IST on December 24 and deployed the roughly 6,100 kg spacecraft about 16 minutes after launch.
- ISRO confirmed injection into a near-circular orbit of about 520 km at 53° inclination, achieving 518.5 km against a 520 km target.
- BlueBird Block-2 enables direct-to-smartphone 4G/5G connectivity using a 223 m² phased-array antenna, described as the largest commercial communications antenna operating in LEO.
- The flight was LVM3’s sixth operational mission and the second consecutive LVM3 launch within 52 days, demonstrating consistent heavy-lift performance.
- AST SpaceMobile took control after separation with nominal telemetry reported, as Indian leaders praised the success as strengthening the country’s global launch credentials.