Particle.news

Download on the App Store

Intel Tests 18A Wafers at Arizona Fab, Achieving Key Milestone in U.S. Chip Manufacturing

The company's first run of 1.8nm-class wafers in Arizona signals progress for its advanced semiconductor technology and domestic production ambitions.

  • Intel's Arizona Fab 52 and Fab 62 have completed initial testing of 18A (1.8nm-class) wafers, marking a significant development for the company's manufacturing capabilities.
  • This milestone represents the transfer of Intel's advanced 18A process from its Oregon facility to its new high-volume production site in Arizona.
  • The 18A node features cutting-edge RibbonFET transistors and backside power delivery, promising improved performance, reduced power consumption, and higher transistor density.
  • The development coincides with Intel's appointment of new CEO Lip-Bu Tan, which contributed to a 15% rise in the company's stock price this week.
  • While the Arizona fab remains in the testing phase, Intel plans to use the 18A process for upcoming products like Panther Lake processors, with mass production anticipated later this year.
Hero image