Particle.news
Download on the App Store

Ibama Approves Petrobras’ Emergency Simulation for FZA-M-59 With Conditions

Approval moves Petrobras closer to a drilling license, contingent on improved fauna safeguards with clarified vessel positioning.

Overview

  • The technical team at Ibama validated the Avaliação Pré-Operacional conducted in August for the Foz do Amazonas block, the final procedural step before a potential drilling license.
  • Ibama cited points of attention, saying Petrobras’ wildlife rescue plan is not capable of ensuring adequate care in an oil spill scenario and ordering a new fauna exercise.
  • The agency flagged deviations from the previously presented vessel positioning and requested specific adjustments to emergency plans before a licensing decision.
  • Petrobras said it will resubmit revised fauna and emergency materials by Friday, September 26, after an exercise that mobilized more than 400 personnel, multiple vessels and aircraft.
  • Ibama’s report recorded incidents during the fauna drill, including a boat caught in a fishing net, a grounding, a near collision, use of unauthorized boats and pilots without proper safety gear.