Hyundai Opens $7.6B Georgia EV Plant, Announces 67% Production Expansion
The Georgia Metaplant, now operational, will produce up to 500,000 vehicles annually and marks a cornerstone of Hyundai's $21 billion U.S. investment strategy.
- Hyundai's Georgia Metaplant officially opened on March 26, 2025, producing the Ioniq 5 and preparing for the launch of the Ioniq 9 three-row electric SUV.
- The plant's production capacity will grow from 300,000 to 500,000 vehicles annually, including both electric and hybrid models, in response to fluctuating EV demand.
- Hyundai's broader $21 billion U.S. investment plan includes a $5.8 billion steel plant in Louisiana and aims to create over 100,000 direct and indirect jobs nationwide.
- The Georgia facility incorporates advanced manufacturing technologies, including AI, robotics, and renewable energy, to optimize production and reduce emissions.
- The investment strategy helps Hyundai mitigate new U.S. tariffs on foreign-made vehicles while strengthening its competitive position in the American market.