Particle.news

Download on the App Store

Hydraa Suspends Lingampally Demolition to Advance Nallagandla Drain Clearance

Paused by corporator intervention in Lingampally, the campaign shifts focus to Nallagandla stormwater drain clearance with monsoon waste removal by emergency teams.

Image

Overview

  • Local corporator Nagendar Yadav intervened in Hydraa’s demolition at Lingampally, prompting a temporary suspension of work along the nala near HUDA Trade Centre.
  • Endowment officer Bharati rejected Yadav’s proposal to spare the encroaching buildings, emphasizing that violators’ structures cannot occupy public drainage channels.
  • On Friday Hydraa bulldozed unauthorised apartments obstructing the stormwater drain in Nallagandla’s Huda Colony to restore flow capacity.
  • Hydraa’s Monsoon Emergency Teams cleared tons of debris from open nalas across Madhura Nagar, Krishna Nagar, Gachibowli and Mithila Nagar to bolster monsoon preparedness.
  • The operations form part of a citywide effort to reclaim encroached drains and lakes and reduce flood risks even as political and legal challenges emerge.