Particle.news

Download on the App Store

High-Level Probe Launched After Bridge Construction Mishap in Odisha Kills Three

A collapsed concrete slab during bridge construction in Cuttack claimed three lives, prompting government inquiries and victim compensation measures.

All five of them were shifted to SCB Medical College and Hospital by ambulance, where three labourers were declared by doctors. (File)
Image
3 killed, 2 injured after concrete slab falls at Odisha construction site
Image

Overview

  • A prefabricated concrete slab collapsed during bridge construction over the Kathajodi River in Cuttack, killing three, including a site engineer, and critically injuring two others.
  • The accident occurred on May 3, 2025, when a crane reportedly malfunctioned while lifting the slab, though the exact cause remains under investigation.
  • Chief Minister Mohan Charan Majhi announced an ex-gratia payment of Rs 5 lakh for the families of the deceased and free medical treatment for the injured.
  • The Odisha Works Department has formed a high-level technical committee to investigate the incident and identify responsible parties, with findings expected within 15 days.
  • Local leaders, including Cuttack Mayor Subhas Singh, have called for strict accountability, citing potential negligence in safety protocols at the construction site.