Particle.news

Download on the App Store

Grand Floridian Lobby Shows Finishing Touches as Disney Advances Entrance Overhaul

Work now centers on visible upgrades as entrance and parking changes await regulatory review.

Overview

  • New gold‑tone light fixtures were installed at the former check‑in area during the ongoing lobby remodel.
  • The main staircase has reopened with a newly revealed mural and brighter carpeting, signaling progress into the finishing phase.
  • Construction continues on the birdcage‑inspired bar with new cladding added, while avian‑themed wallpaper appears in elevator bays.
  • The Garden View Tea Room remains an active construction zone and has not reopened since 2020.
  • Disney filed plans to reconfigure the resort entrance to connect with World Drive roundabouts, with SFWMD review pending, as crews widen and reroute Floridian Way; the 2025 Gingerbread House display is canceled.