Overview
- Four new individual desks now handle check-in, providing eight stations in place of the former long counter.
- A refreshed Bell Services area is operating with new wallpaper and curtains, and a children’s lounge with seating, a TV, and an activity table has been added.
- Large sections of the central lobby remain closed off as crews remove old carpet, stage new rolls, and keep the birdcage elevator out of service.
- Construction on the birdcage-style lobby bar continues with added faux wood paneling, a wood-grain roof element, and the first counter pieces in place.
- New golden light fixtures and other décor have been installed, and Disney has canceled the resort’s 2025 life-size gingerbread display during the renovation.