Particle.news

GMRL Pitches Double-Decker Metro–Road Viaduct on Gurugram’s SPR as HMRTC Studies Option

The plan seeks a unified DPR to prevent duplicated structures on the Southern Peripheral Road.

Overview

  • GMRL has submitted a concept to HMRTC and the project’s design consultant to stack the Sector 56–Pachgaon metro and an elevated road between Ghata Chowk and Vatika Chowk on shared piers.
  • Under the proposal, one deck would carry the metro and the other an elevated roadway, using common foundations to cut costs and conserve right of way.
  • HMRTC is examining the double-decker option and has sought a technical study from RITES to assess feasibility on the overlap stretch, according to new reporting.
  • GMRL has urged preparation of a single, comprehensive DPR that incorporates the elevated road’s design, alignment, structural systems and cost for an integrated build.
  • The 36 km elevated corridor with 28 stations is estimated at about ₹8,500 crore, and the state and GMDA have already approved an elevated road on the same SPR segment.