Overview
- Söllereck in Oberstdorf opens on Sunday, 23 November, according to the operators’ association VDS.
- Ski operations on the Zugspitze begin on Friday, 28 November.
- Garmisch-Classic introduces a new eight-seat chairlift with weather protection following an €18 million project.
- Skizentrum Mitterdorf invests about €23 million in two chairlifts designed for summer use to support year-round operations.
- The Höllwies drag lift at Söllereck is planned to return after five years with an energy-saving drive, as resorts add family-oriented experience trails and report their best winter since the pandemic.